Your metal building order is placed and your site is prepped. Now what? Here is a step-by-step look at what happens on delivery and installation day.
Before the Crew Arrives A few days before your scheduled installation, our team will confirm your delivery date and time window. Make sure your site is fully prepared — level, clear of obstacles, and accessible for the delivery truck. If you have a concrete pad, it should be fully cured (at least 7 days for standard concrete, longer in cold weather). Delivery Day The installation crew arrives with a truck loaded with all the steel components for your building — precut and pre-drilled framing, roof and wall panels, trim, fasteners, doors, and anchoring hardware. Everything is manufactured to your exact specifications and labeled for efficient assembly. The Installation Process Step 1: Layout and Anchoring The crew begins by laying out the building's footprint and installing the anchor system. On concrete, this means drilling holes and setting wedge anchors. On gravel or dirt, auger-style ground anchors are driven into the earth. This step ensures the building will be securely attached to its foundation. Step 2: Frame Assembly The steel frame goes up next. Vertical legs are set on the anchors, and horizontal purlins and bracing connect them to form the building's skeleton. The…